| In 1979, the company setup its first Rolling mill and followed it up with a massive programme of verticals and horizontal integration, there by commissioning: Wire Rod Rolling Mill (1982-83), Induction furnaces (1985-86), Oxygen Plant (1989), Steel Wire Drawing Unit (1991), Tyre Bead Wire Unit (1993), Electric Arc Furnace(1995).
| DESCRIPTION | CAPACITY | MAKE | ELECTRIC ARC FURNANCE (EBT/UHP) with facility for eccentric bottom tapping and continuous feeding system for D.R.I./H.B.I/SPONGE Iron -Ensures slag free tapping | 30 MT | ABB | | LADDLE FURNACE used for secondary refining of steel, - Corbon injection Machine Helps making slag foamy. - Dual wire feeding arrangements exits for (AL.CA-SI) | EQUAL CAPACITY | 21st CENTURY | | LADDLE DEGASSING (STEAM EJECTOR VACUUM PUMP SYSTEM - 5 STAGES) | 35MT | VOIEST ALPINE | | CON-CAST MACHINE | 6/11 METER 3 STRANDS | CONCAST ZURICH | | ELECTRO MAGNETIC STIRRER | | AEG ELOTHERM COMBI - TYRE |
| 3 ROLLING MIILS ( 5 STRANDS 3 HIGH) | 18",12" & 10" | |
| ROUGHING STAND | 28" | |
|